|
TechWatch
Technical hints from Premier EDA Solutions Ltd.
www.eda.co.uk |
You have been working on a design for the past 6 weeks. It is almost complete, but you want to check that changes made to the component library do not critically impact your design. In this Exercise, you will learn how to generate a quick report of all components that have been updated since you loaded the netlist. With the component update report, you can easily verify that all of your design components are current. To generate a report of component library changes:
Assume that your calendar indicates the netlist was loaded and most components were placed on August 16th. The steps to report on library changes after this date will be detailed below. To query a library for a ModifyDate after August 16:
Report on Updated Components
You can generate a report on these updated components. This report can be easily compared with a Bill of Materials from your design. You can determine which attribute changes, if any, impact your final board design.
Return to the exercise index. Proceed to the next exercise. |
||||||||||||||||