Engineering Change Order System |
|
|
For any process that allows the software to change the design, Altium Designer uses Engineering Change Orders. Whenever any process such as updating the board or re-annotating the schematic is performed, Altium Designer will list each change in an ECO list. ECO lists can be saved if traceability is required. |
|